Menu

New Initiative

Conversion of Solid Waste

Useful Conversion of Solid Waste in Municipal Area:

Scientific and useful disposal of waste is the need of the hour. Salient features of the project are:

  1. Tender on BOOT Basis
  2. Plant site: Village Langariyawas.
  3. Municipal Solid Waste supplied to the contractor at plant site: 350 MT/Day. (Plant capacity 500 MT per day)
  4. Land Required by Contractor :25 Acres
  5. Revenue share with Jaipur Municipal Corporation is Rs. 1.01 /MT.
  6. Rs./MT/Year,Performance Guarantee (in the form of Bank Guarantee) : Rs. 20.00 Lakhs.
  7. Lease Period: 30 Years
  8. Lease Amount Re. 1.00 /Sq. Mtr./Year

Letter of Acceptance has been issued to M/s Grasim Industries Limited Mumbai on 13.06.05. The agreement was executed. The work for establishing the Plant has been completed on 31.01.2007. Estimated cost of Project: 20 Crore.

 

Complete Sanitation Work

Complete Sanitation Work in 3 zones namely Hawamahal (East), Hawamahal (West), Motidungari and Pratap Nagar has been contracted out through national tendering to competent private SWM service providers.

 

Zone

Exp. of 1stYear

Exp. of 2ndYear

Exp. of 3rdYear

HM (East) Zone

Rs. 2.40 Cr.

Rs. 2.59 Cr.

Rs. 2.76 Cr.

HM (West) Zone

Rs. 2.24 Cr.

Rs. 2.45 Cr.

Rs. 2.70 Cr.

MD Zone

Rs. 2.00 Cr.

Rs. 2.11 Cr.

Rs. 2.35 Cr.

Pratap Nagar Area

Rs. 0.29 Cr.

Rs. 0.29 Cr.

Rs. 0.30 Cr.

 

 

Benefits of The New System are:

  • Door-to-door collection
  • Transportation of Garbage in Covered Vehicles.
  • Proper Deployment of Dustbins
  • Use of Modern Equipments
  • The system ensures private investment as well as public participation with small amount of monthly user charges.
  • Size of JMC garage can be kept at manageable level.

Complete Sanitation Work Through Private Contract:

Complete Sanitation work in 3 zones namely Hawamahal Zone (East), Hawamahal (West), Motidungari Zone and Pratap Nagar has been contracted out through National Tendering.

 

 

Daily Shifting :

Dairies working in the Municipal Area are likely to be shifted out of the Municipal Area. The alternative sites have been allotted by JDA at village Surajpura, Ramalyawala and Harchand Pura.

Improved Slaughter House (Chainpura):

To give much awaited relief to the residents of Moti Dungari and Chandpole, the old Slaughter Houses located in these areas have been shifted at an Improved Slaughter House at Village Chainpura. Substantial work is already complete with an expenditure of Rs. 1.00 crore.

 

E-Governance (I T Solution):

An E-Governance Project is in progress through a Private IT Solution Provider.

  • The total project cost for Jaipur is 6.5 crore.
  • Project duration: six and half years (2 phases).
  • 26 modules for each of the municipal functions viz:
  • Creation of data base for house tax through field survey.
  • Implementation of double accounting system,
  • Grievance redressal system
  • House tax, lease, property rentals
  • Interconnectivity of all zone offices with the head office
  • Death and birth certificates
  • 13 online e-governance centers are being established.
  • 1st Phase of the project is complete.

 

 

Learning from Best Practices:

It is our endeavor to learn from the best practices of municipal functioning in various areas of activities being practiced by other municipal bodies allover India and abroad. For this, continuous and sustained interaction and exposure tours of the Officers and Public Representatives are being organized. Of late, we had interaction with municipal authorities of Pocheon (Korea), Rajamundary (Andhra), Pune, Chandigarh etc

 

 

Citizen Help-Line Center:

JMC has established a Help-Line for resolution of Public Grievances regarding sanitation, sewer, street lights etc. This Help-Line works 8:00 AM to 8:00 PM. The Municipal Corporation Help-line has provided relief to substantial number of citizens by now.

This ultra-modern citizen helpline center has been constructed at a cost of Rs. 16 lac, with 50 per cent private contribution

 

 

Clean City Campaign:

 

  • Clean City Rally : Around 5000 students participated in the "Run for Clean City" Rally, held on 24.08.04. This Rally was flagged off by Hon'ble Chief Minister. The total project cost for Jaipur is 6.5 crore.

Support of leading news paper Dainik Bhaskar, Oasis, SARAS Dairy, Sulabh International, Traders' Association etc. have been enlisted for effectively carrying out this campaign. Free publicity is being provided by Dainik Bhaskar News Paper. Jackets and Caps have been provided by Dainik Bhaskar. Oasis and Rainbow Mobile Companies have provided 3000 T-Shirts with the message "Clean Jaipur, Green Jaipur" for "Run For Clean City". SARAS (Dairy Federation) had served free of cost chilled milk to the participants in the Rally.

 

 

Project for Ward Offices :

In order to ensure de-centralized functioning, JMC plans to have ward offices in all 77 wards. Each ward office will have a computer with grievance redressal software. Each ward office will be constructed at an estimated cost of Rs. 2.50 lac. Construction of 20 such ward offices has been completed till now i.e. 28.09.2010.

 

 

Urban Renewal in Walled City:

  • Considerable urban renewal work has been done in walled city area. These works include:
    1. Re-furbishing the buildings/markets in Pink color.
    2. Underground shifting of overhead electric/TV cable wires.
    3. Repair of Roads, Footpaths, etc.
    4. Repair and painting of medians/railings.
  • Project for Heritage Walk: A project for Heritage Walk from Chhoti Chopar to Taal Katora has been prepared by JMC. The estimated cost of the proposed project is Rs. 60 lac. This will serve the purpose of showcasing the rich heritage to the tourists.

 

 

Global Art square at Jaleb Chowk (Proposed):

  • Under the direction of Hon?ble CM, JMC initiated a plans to develop Jaleb Chowk into a world class global art square. Now this work has been transferred to Jaipur Heritage.
  • Project for Heritage Walk: A project for Heritage Walk from Chhoti Chopar to Taal Katora has been prepared by JMC. The estimated cost of the proposed project is Rs. 60 lac. This will serve the purpose of showcasing the rich heritage to the tourists.

Energy Saving (Proposed) :

  • JMC has invited tenders to implement the energy saving project on ESCO basis wherein the high consumption lights are to be replaced by energy saving lights.
  • The above project is in process of approval.
  • Minimum 30% energy saving will be possible.
  • Total cost of project will be borne by the tenderer.

 

 

 

Re-habilitation Housing Scheme:

Sanjay Nagar Bhatta Basti:

  • Scheme of 10,000 houses at a project cost of Rs. 100 crores for in-situ rehabilitation of Sanjay Nagar Bhatta basti and 17 adjoining slums in Vidyadhar Nagar has been taken up.
  • Estimated unit cost of each house is Rs. 1,00,000/-
  • The project shall be completed within 3 years.
  • As per revised direction by GoR this project is to be taken up under JNNURM.
  • Housing units of G+3 shall be constructed.

Re-habilitation Kharda Kachchi Basti :

  • Similar scheme to develop 335 houses at Kharda katchi basti at Ajmer Road has been taken up.
  • The project cost is Rs. 1.67 crore.
  • Out of four blocks work of 68 houses is complete.

 

 

JNNURM Projects:

SWM Project: A project costing 13.19 crore has been approved by GoI under which following works are to be undertaken:

  • Renovation of 4 Garages at Lal Kothi, VD Zone, Chaugan and Jhalana
  • 5 Garbage transfer stations at VD Zone, Jhalana, Galta Gate, Sushilpura, Gujjar Ki Thadi and Pratap Nagar.
  • Renovation of 4 Garages at Lal Kothi, VD Zone, Chaugan and Jhalana
  • Establishment of Landfill site at Langariawas ? Order for DPR given to M/s Ramky Hyderabad
  • Compost Plant at Sevapura - EOI don, RPF issued. Technical & Financial bids to be submitted on 23.03.2007.
  • Purchase of 94 containers of 3 Cms and 9 DP vehicle to be done ? Amount earmarked 101 lac.

2. Renovation of Chokadi Sarhad (Jaleb Chowk) Ward 58 : A project of Rs. 12.00 crore has been sanctioned by GoR. All NITs have been done. Work orders for 1.76 cr. has been given. Under this project roads, footpath, decorative lighting, landscaping etc works are to be done.

3. Sewerage Project Phase? II : A Project of Rs. 110 Cr. has been sanctioned by GoI. Under this project all the NIT have been done for following components:

  • Sewerage Treatment Plant at Jaisinghpura Khor ? Rs. 22.50 Cr
  • II Unit of STP at Delawas? Rs. 28.12 Cr.
  • Power Generation Plant at Delawas ? 7.50 Cr
  • Property Connections in walled city ? 36.69 Cr.
  • Laying of sewer lines in 17 colonies from Transport Nagar to Ramgarh Mod ? length of sewer lines : 41 KM

 

A. A project costing 13.19 crore has been approved by GoI under which following works are to be undertaken:

  • Total Sanitation Staff: Sweeper 6330, Jamadar (Supervisor) 208, Sanitary Inspector 70, Chief Sanitary Inspector 10: 6618
  • Houses covered: 5 lacs (approx.)
  • Collection Points: 2500
  • Slums: JMC: 165, JDA: 47 Total: 212

B.

  • Sanitation System: Sweeping in all wards (except Pratap Nagar area) is done by JMC Staff.
  • Land-fill Sites:
    1. Mathuradas pura, Area: 176 Bigha Distance: 17 K.M
    2. Sewapura Area: 200 Bigha Distance: 20 K.M.
    3. Langariawas Area: 483 Bigha Distance 21 KM.
  • Daily Solid Waste Generation: 1040 MTs
  • Daily Lifting: 900 MTs.
  • Remaining Solid Waste is Transported by Special Weekly/ fortnightly drives

C.

  • JMC Equipments: JMC Garage Vehicles & Equipments

 

I. For Civil Line Zone, VD Zone & Sanganer Zone (except Pratap Nagar Area)

S.No.

Partucular

Owned By JNN

1.

Excavator Loader (JCB Make)

5

2.

Front End Loader (Escort Make) JCB

10

3.

Dumper

  1. Tata
  2. Leyland
  3. Cauter

21


·  10

·  10

·  1

4.

Tractor-Trolley ? Leveler

20

5.

Bull Dozer

1

6.

Dumper Placer Equip.

  1. For 7 Cms bins
  2. For 4.5 Cms
  3. For 2.5 Cms

26


·  10

·  2

·  14

7.

Dumper Placer Container

  1. 7 Cms
  2. 4.5 Cms
  3. 2.5 Cms
  4. 1.1 Cms Container RC (by compactors)

475


·  100

·  35

·  490

·  300

8.

Road Sweeper

3

9.

Sewer Jetting & Suction Machines

16

10.

Cattle Vehicles

5

11.

Auto Jetting Machine

4

12.

Hydraulic Platform

4

13.

Weighbridge

1

14.

Truck

4

15.

Refuse Compactor 14 Cms (for 1.1 Cms Bins)

5

 

II. Vehicles in 3 Contracted Zones namely Moti Dungari, Hawamahal (East) & Hawamahal (West) Zone and Pratap Nagar Area (SN Zone)

Vehicle Type

MD Zone

East Zone

West Zone

Pratap Nagar

Total

Atul Shakti Auto

-

10

10

-

20

Minidoor

-

15

13

-

28

TATA 407, 709

3

6

6

-

15

Compactor

3

2

2

1

8

Tractor

5

35

35

-

75

Dumper

6

2

2

-

10

Loader

4

2

2

-

8

JCB

-

-

-

-

-

Rickshaws

52

106

101

33

292

Sewer Suction

1

1

-

-

2

Auto Jet

1

-

-

-

1

Containers

265

-

-

10

275

Total

340

179

171

44

734

 

Containers: 231 (1-2 ton) Bins: 200 (30 liters)

  • Equipments for communication: 90 Wireless sets
  • JMC Annual Expenditure:


Salary per month

  •  
    1. Sanitation Staff: 188.75 lac per month
    2. Sewper Staff: 3.50 lac per month
    3. Others: 187.92 lac per month
    4. Total: 620.13 lac per month

Other SWM Related Activities:

  • Carcass Plant, Cost: 2.5 cr.
  • Capacity : 25 Animal/8 Hrs
  • Year: 2002
  • Distance : 20K.M
  • Slaughter House : Distance : 20 K.M
  • Dog House : Distance : 12 KM
  • Animal Shelter : 1. Hingonia, 2. Sanganer, 3. Johari Bazar
  • Total Capacity: 6000 Cattles

 

 

 

Bio-medical Waste Facility

  • Total Hospitals: 535 (511 Private + 24 Govt.)
  • Beds: 8000
  • Waste Generation: 3 MT Connected to Bio-medical common facility: 409 Hospitals (391 Pvt. + 18 Govt.)
  • Facility Provider: Instromedix India Pvt. Ltd
  • Rate per Bed/day: For the year 07-08 Rs. 3.10 and For year 08-09 Rs. 3.15 to be paid by the Hospitals/Clinics.

Hotel/Restaurants:

  • 300 Hotels
  • 500 Restaurants

Sulabh Complex and Toilets:

  • JMC: Complete 56 Under Construction 12
  • JDA: Complete 18 Under Construction 4
  • BOT (by JMC): 12

 

: : visits count
Webpage Last Updated on : Wed Jun 08 13:51:43 IST 2016