SMART CITY

SMART CITY MISSION : Rajasthan

INTRODUCTION

•        Smart City Mission Launched by Hon’ble Prime Minister of India in  June 2015

•        Target of 100 Cities to be developed as Smart Cities in India

•        Mission Period 2015-2020 (5 years)

•        Rs 100 Cr per city for 5 years to be given as grant by GOI

•        Jaipur, Udaipur, Kota & Ajmer (4 Cities) of Rajasthan among the list of 97 Cities to be developed as Smart Cities

•        Selection of Cities through competition after evaluation of the Smart City Proposals (SCP)prepared through Intense Citizen Consultation by the Cities by a Panel of Experts put in place by MoUD ,GOI

•        The SCP to be Implemented through a dedicated SPV through 2 strategic ways of development  i) Area Based Development(ABD) ii) Pan City Development

•        Area Based Development further is sub divided into 3 components

•        Retrofitting: Planning & Development in existing built up area

•        Redevelopment: Replacing of Existing Built environment

•        Greenfield: Development of a Vacant Area

•        Pan City Development: application of selected Smart Solutions to the existing city-wide infrastructure.

STATUS

All the four Smart Cities namely Jaipur, Udaipur, Kota & Ajmer from Rajasthan have been selected under Smart Cities Mission.

—  Total investment plan approved  by MoUD: Rs 7025 Cr

Jaipur       -  Rs 2401 Cr            Ajmer      - Rs 1947 Cr

Udaipur  -  Rs 1221 Cr                Kota        - Rs 1456 Cr

 

—  The SPV for Jaipur, Udaipur, Kota & Ajmer namely Jaipur Smart City Ltd (JSCL), Udaipur Smart City Ltd (USCL), Kota Smart City Ltd (KSCL) &Ajmer Smart City Ltd (ASCL) have been incorporated under the Company’s Act 2013.

—  M/s Eptisa Serviceos SL (Spanish Company) for Jaipur, Udaipur & Ajmer and M/s Royal Haskoning DHV for Kota have been appointed as the Project Management Consultants (PMC).

—  Human Resource of SPV for all four Smart cities i.e. CEO, Addl. CEO, CFO, CS, SE & EE are in place.

—  Rs. 194.00 Cr as Ist installment from GoI has been received for Jaipur & Udaipur separately and transferred to Jaipur Smart City Ltd & Udaipur Smart City Ltd. along with matching GoR share (Rs. 120.00 Cr).

—  Rs. 91.00 Cr & Rs 92.00 Cr as part of 1st installment from GoI has been received for Kota & Ajmer respectively and transferred to Kota Smart City Ltd & Ajmer Smart City Ltd. along with matching GoR share of Rs. 54.60 Cr & 55.20 Cr respectively.

Projected fund flow is shown in the Table below:   Rs in Cr

City

Year 2015-16

2016-2017

2017-18

2018-19

 

GOI

GOR

ULB

Total

GOI

GOR

ULB

Total

GOI

GOR

ULB

Total

GOI

GOR

ULB

Total

Jaipur

200

120

80

400

100

60

40

200

100

60

40

200

100

60

40

200

Udaipur

200

120

80

400

100

60

40

200

100

60

40

200

100

60

40

200

Kota

0

0

0

0

200

120

80

400

200

120

80

400

100

60

40

200

Ajmer

0

0

0

0

200

120

80

400

200

120

80

400

100

60

40

200

 

   Smart City Proposals at a glance:

Jaipur

The total project Proposals of the SCP:  Rs. 2401 Cr.

•      Area Based Development (ABD): Rs. 1582 Cr.

•      Pan City Proposal: Rs. 819 cr.

  Area Based Development: Retrofitting Model: The area comprising of Walled city area of either side of the axis between Badichopad&ChotiChopad& extended to include Albert Museum totalling 600 Acres.

                 Major Sectors considered:- 

•      Sustainable Mobility Corridors

•      Heritage & Tourism

•      Smart Civic Infrastructure

•      Pan City Proposal :-

•      Multi Modal Public Transit Central Operation & Management centre

•      Smart Mobility card

•      Solid Waste Management

•      Public Information System

 

Udaipur

The total project Proposals of the SCP:  Rs. 1221 Cr

• Area Based Development (ABD):  Rs. 880  Cr

• Pan City Proposal: Rs. 341 Cr.

•    Area Based Development: Retrofitting Model: The area comprising of Walled City adjoining Pichola Lake totalling 828 Acres.

                     Major Sectors considered:- 

                    •      Sewerage

                    •      Power Supply

                    •      Conservation of Buildings & heritage

•      Pan City Proposal :-

    •         Intelligent Transport Management System (ITMS)

    •         Citywide Smart Utilities

 

 Kota

       The total investment plan for the Mission period is Rs. 1455.00 Cr.

•         Area based development (Retrofitting)  = 1067.00 Cr

•         Pan City Development                        = 319.00 Cr. 

           (Rs.  69.00 Cr.  Contingency, PMC fee etc extra)

•         Area based development(Retrofitting): Pedestrian friendly city with recreational facilities, Development of tourism activities, Provide hard infrastructure, Environmental sustainability and water body conservation, Development of Dusshehra ground, Redevelopment of Ghodewala Baba Slum.  

•           Pan City Development: Water Management with use of improved technology, Integrated Traffic Management system, Solid Waste Management.

•      The mode of Area Based Development is Retrofitting earmarked after intense citizen consultation.

•      The area selected is the central located twin lakes known as KishorSagar&KotriTalab and its nearby area totalling 1459 Acres.

 

    Ajmer

     The total investment plan for the Mission period is Rs. 1947.62 Cr.

•         Area based development(Retrofitting)  = 1731.94 Cr

•         Pan City Development                                  = 215.68 Cr. 

•           Area Based Development (Retrofitting): Heritage, Art & Culture, Tourism, Transportation & Mobility, Pristine Environment &eco-friendly recreational projects, development of Economy & Innovation Hotspot .   

•           Pan City Development: Integrated Traffic Management, Security & Surveillance system, Intelligent Street lights, City E-governance. 

•           The mode of Area Based Development is Retrofitting earmarked after intense citizen consultation.

•           The area selected is the northern and central part of the city surrounding Ana Sagarlake covering 1526 Acrs of the land. The area comprising 13 wards which includes a Holistic, inclusic and transformatic retrofit development of area extending from Martin Dale Bridge, covering railway station, Gandhi Bhawan Chowk, Madar Gate, Bus Stand, JLN Hospital, Daulat Bag, Gaurav Path, Pragati Nagar, Civil Lines, Vaishali Nagar etc.   

 

Projects  Launched on 25.06.2016 (Quick Win Projects)

Udaipur

a. Sewerage works in walled city Area   -  Rs 5.75 Cr

b. Providing and installing Open Air Gym equipments in GulabBagh -  Rs 8,63 Lakhs

c. Conservation& Development of Heritage Facade for Historic bazaars of Walled City - RS 5.99 Cr

d. Setting up of Smart Classrooms in Govt. Schools of Walled City Area  - Rs 79.21 Lakhs

e. Construction of Control & Command centre at Town Hall  - Rs 1.22 Cr

f. Installation of Solar Roof Top Power Plants -  RS 1.32 Cr

 

Jaipur

a. Installation of Solar roof Top Power Plants - Rs 81 Lakhs

b. Restoration of Baories (Traditional Water Bodies)

c. Public Information Display System - on PPP for real time display on bus Q Shelters by Jaipur city Transport Services Ltd.

 

: : visits count
Webpage Last Updated on : Tue Apr 11 12:05:54 IST 2017