Menu

Daily Project Report PIC Gallery

B W work start for proposed bhart mata park 

Pic 1         Pic2         Pic 3         Pic 4         Pic 5          Pic 6        Pic 7      Pic8

Bt work bhim Nager ward 60 Anwar bhati home road

Pic 1       Pic 2 

C block johad beed park BW excavation work start

Pic 

Dharnidhar talab work 

Pic 1           Pic 2            Pic 3             Pic 4

Opposite Bishnoi Dharamshala Public Park Highmast

Pic 1          Pic 2

Rajeev Gandhi Murti, opposite Bothra Complex Highmast

Pic 1          Pic 2

Sahid Smarak Public park Highmast

Pic 1      Pic 2

Saket dham Mali samjah shamshan bhumi work complete

Pic 1       Pic 2

Pabu chowk

Pic 1        Pic 2

Khatu Shyam Mandir, Medical College Hostel, Public park, Shani Mandir ChorahaPublic park Highmast

Pic 1           Pic 2          Pic 3

Gokul circle & Lali bai park boundary wall & Soorsagar Repairs

Pic 1            Pic 2          Pic 3

 

 

 

80 ft master plan road site visit

Pic 1          Pic 2          Pic 3           Pic 4            Pic 5       

Connecting bridge Foundation excavation at haldiram moolchand heart care hospital 

Pic 1          Pic 2          Pic 3          Pic 4

Bt work sarvody basti Anwar Bati home and bhim Nager

Pic 1          Pic 2           Pic 3

Bidasar House 

Pic 1        Pic 2

Jodbeed Park & Entry Gate

Pic 1          Pic 2

80 ft master plan between napasar highway and nh 11

Pic

Footpath work lali bai park

Pic

Gawra devi nalla covering roof casting

Pic

Gol park

Pic

Laxminath ji mandir footpath work

Pic

Near jail ward 33 cc road  XEn sir site visit

Pic

Pawarsar cc road

Pic

Tessitory park

Pic

Ved Magha Ram park

Pic

 

 

Fountains maintenance work

Pic 1        Pic 2

Gali no 18 Rampura Basti 

Pic 1       Pic 2        Pic 3

Jat samaj shamshan work start

Pic 1     Pic 2      Pic 3

Gharsisar Railway Phatak se Overbridge tak Poles & Lights installed

Pic 1        Pic 2

Soil filling at aamjan bharman path near rajiv marg 

Pic 1       Pic 2

Vinoba Maidan Poles & Lights installed

Pic 1        Pic 2       Pic 3

Jungle clearance near jain school

Pic 1        Pic 2

राजवंश सर्किल विकास कार्य

Pic 1      Pic 2

Cc work w. no  31

Pic

Pentar bhoj street w no. 5. cc work

Pic

Beti gaurav udhyaan compound wall lay out given

Pic

 

 

Laxminathji mandir wall work && Jain school cc road

Pic 1        Pic 2

Dakhsnishwar hanuman ji hall roof Curing && Bus stand cc work

Pic 1       Pic 2        Pic 

Sofia School Highmast LED Light installed

Pic

Sector 11 mp nagar me roof casting

Pic 1       Pic 2        Pic 3

Babu mohta street ward no 17

Pic 1       Pic 2

Bt work bhim Nager ward 60

Pic 1       Pic 2      Pic 3

Jain School CC Road

Pic

Hall foundation Excavation work Gangashahar Road

Pic

 

Lakshminath ji Mandir Lights Work

Pic1       Pic 2        Pic 3        Pic 4        Pic 5      Pic 6

Beautification work of Rajvansh Circle

Pic 1      Pic 2

Dakshineshwar hanuman mandir karmisar road cube Sampling

Pic 1       

Cc Road work at Indraprasth Colony

Pic

Jain school road Curing

Pic 1        Pic 2       Pic 3       Pic 4 

LED Lights Installation at Near Khatu Shyam Mandir Jaipur Road 

Pic 1      Pic 2   

Highmast LED installation work at Udasar

Pic 1     Pic 2      Pic 3

Road carpating work D block MDVN  & Colour  paint work in park MDVN

Pic 1        Pic 2         Pic 3        Pic 4

Rampra gali no 18

Pic 1       Pic 2      Pic 3      Pic 4        Pic 5

25th Highmast Installation at Bhutto ka chouraha

Pic 1     Pic 2

 

 

BT ROAD WORK GOGA GATE HARIJAN BASTI TO CHOPARA KATALA && Rani Bazar Area & Panchamukha Hanuman Mandir Area 

Pic 1        Pic 2      Pic 3         Pic 4      Pic 5

Entry Gate & Saket Dham Mali Samajh 

Pic 1        Pic 2       Pic 3       Pic 4

Panel repring Lili pond Arvind Sharma

Pic

WBM Work Gali no 18 Rampura Basti

Pic 1      Pic 2 

Jagannath Ji Mandir Parisar Park Work

Pic

R Tech Site Visit

Pic 1      Pic 2       Pic 3       Pic 4

PCC work Shri Laxmi Nath Ji

Pic 

Work Started at Jethmal House to Perm Singh Ji House Udasar

Pic 1      Pic 2       Pic 3        

: :
Website last update: 13/09/2023 08:19:54
You are visitor No :-